Due to financial constraints my house extension build has come to a stop . I was hoping to do a lot myself to save funds but with working away , it meant paying the builder .
House on stop
- CantCorner
- Posts: 753
- Joined: Thu Mar 29, 2018 12:57 pm
House on stop
It wasn't my fault , I was left unsupervised !
- CantCorner
- Posts: 753
- Joined: Thu Mar 29, 2018 12:57 pm
Re: House on stop
Weatherproof but unfinished inside . Bit by bit over the next couple of years .
It wasn't my fault , I was left unsupervised !
- Ninjachica
- Posts: 2049
- Joined: Thu Mar 22, 2018 7:19 pm
Re: House on stop
I love the different roof lines. Nice touch.
The inside always takes longer than originally planned anyway
The inside always takes longer than originally planned anyway
If it ain't fun, don't do it
- CantCorner
- Posts: 753
- Joined: Thu Mar 29, 2018 12:57 pm
Re: House on stop
Probably the most expensive in Wales but definitely not the most valuable !
Only I could start a build just as the cost of materials sky-rocket .
It wasn't my fault , I was left unsupervised !
- CantCorner
- Posts: 753
- Joined: Thu Mar 29, 2018 12:57 pm
Re: House on stop
Matching roof tiles were double the price so not intentional . Hope these one weather to the same colour before the building inspector arrives .Ninjachica wrote: ↑Tue May 17, 2022 10:15 pm I love the different roof lines. Nice touch.
The inside always takes longer than originally planned anyway
It wasn't my fault , I was left unsupervised !
Re: House on stop
How frustrating for you. There are some things in life you just can't plan for, but at least you have a roof. You'll get the rest done eventually.
- bobsnicholson
- Posts: 2645
- Joined: Thu Mar 22, 2018 8:40 am
- Location: Cheshire
Re: House on stop
I was wondering how the works were going.
Very smart.
Very smart.
Work is for people that can't play golf.